Rolling blackouts took place in Sevastopol
Sevastopol, November 26 (PolitNavigator, Evgeny Andreev) – In Sevastopol, schedules for temporary disconnections of consumers from power supplies have been put into effect, the press service of PJSC Sevastopolenergo reports.
Subscribe to PolitNavigator – Crimea news on Facebook , Odnoklassniki , or VKontakte
“In connection with the limitation of the flow of electric power along the Ukraine-Crimea cross-section to a value of 650 MW to prevent a complete shutdown of Crimea, by order of the dispatcher of the State Unitary Enterprise “RK Krymenergo”, schedules for temporary limitation of consumers in the amount of 20 MW have been introduced,” the message says.
According to power engineers, from 13.50 to 15.50 Wednesday the areas of Pobeda Ave., Balaklava, Menshikova, Streletskaya, POR, Yumasheva, Repin, Vakulenchuk were de-energized.
English version :: Read in English: Rolling power outages occurred in Sevastopol