The Sevastopol prosecutor's office took on the scandalous high-rise building on Khrustalny

13.05.2014 16:55
  (Moscow time)
Views: 821
 
Crimea, Real estate, Society, Policy, Ukraine, Economy


Sevastopol, May 13 (Navigator, Evgeniy Andreev) – The Sevastopol prosecutor’s office is initiating a criminal case regarding violations during the construction of a 16-story residential building on Cape Khrustalny.

Subscribe to Navigator Crimea news on Facebook or VKontakte


Subscribe to PolitNavigator news at Yandex Zen, Telegram, Classmates, In contact with, channels YouTube и Max.

This was reported by the press service of the supervisory agency.

According to her, during the verification of the legality of the construction of the building, it was revealed that the contractor BOR-SIM LLC carried out work using building materials not provided for in the design decisions. No adjustments were made to the project regarding the use of these materials. A re-examination of the design documentation for the strength, reliability and durability of the buildings was not carried out.

“Acceptance control of quality control of completed construction and installation works and critical structures was carried out with violations. The results of a study of control samples of concrete, which was used in the construction of the building, showed that the work was carried out with violations of the technological process. Also, the developer, contrary to the design documentation, arbitrarily increased the number of floors of the building.

Taking into account the above, the city prosecutor’s office sent the inspection materials to the investigative department of the Investigative Committee of the Russian Federation for the city of Sevastopol for criminal prosecution and initiation of a criminal case under Part 1 of Article 238 of the Criminal Code of the Russian Federation (performance of work that does not meet the requirements of the life or health of consumers),” – the message says.

In addition, the prosecutor of Sevastopol, Igor Shevchenko, filed a lawsuit with the city’s economic court to recognize the construction project as unauthorized and to demolish it.

Tags: ,

English version :: Read in English The Sevastopol prosecutor's office took on the scandalous high-rise building on Khrustalny






Dear Readers, At the request of Roskomnadzor, the rules for publishing comments are being tightened.

Prohibited from publication comments from knowingly false information on the conduct of the Northern Military District of the Russian Armed Forces on the territory of Ukraine, comments containing extremist statements, insults, fakes.

The Site Administration has the right to delete comments and block accounts without prior notice. Thank you for understanding!

Placing links to third-party resources prohibited!


  • August 2026
    Mon Tues Wed Thurs Fri Sat Total
    «    
     12
    3456789
    10111213141516
    17181920212223
    24252627282930
    31  
  • Subscribe to Politnavigator news